CE marking is not enough
A machine built to the Machinery Directive starts with an advantage, but CE marking alone is not accepted as proof of conformity for entry into Saudi Arabia. The country has its own technical regulations, issued by the standards body SASO, and customs check that every shipment of regulated products carries the required certificates.
The good news is that the requirements are very close to the European ones: risk assessment, essential health and safety requirements, instructions, nameplate. A manufacturer with a well-made technical file already holds most of the documents; they have to be adapted, not redone.
SABER: who does what
SABER is the online platform on which imported products are registered and certified. The request is opened by the Saudi importer, that is the customer or its agent: the manufacturer supplies the technical documents and hands them to the chosen certification body.
There are two certificates. The product certificate of conformity covers the machine model and is issued by a body accepted by SASO after examining the documentation. The shipment certificate covers the single shipment, is valid for that shipment only and requires the products on board to hold the product certificate already.
It is therefore worth moving before the machine is ready for acceptance testing: if the product certificate arrives when the container is already in port, somebody pays the demurrage.
Which regulation applies to your machine
The SASO technical regulation on general requirements for machinery safety was approved on 28 December 2023 and published in the Saudi official gazette on 29 March 2024. It applies to machinery, interchangeable equipment, safety components, lifting accessories and also to partly completed machinery.
The annex with the customs headings includes, among others, machines for filling, closing and packaging (heading 8422), lifting and continuous handling equipment such as conveyors and elevators (8428), machinery for the food industry (8438) and equipment for heat treatments such as pasteurising and sterilising (8419). The standards referred to include ISO 12100, ISO 13849-1, IEC 60204-1, ISO 14159 on hygiene and the series on food processing machinery.
There are also specific regulations for families of machines: portable or hand-guided machinery (part 1), mobile machinery and heavy equipment (part 2), lifting equipment (part 3), sawing and cutting machines (part 4). Which regulation applies to your product is decided by the customs heading: it is the first piece of data to have confirmed by the importer, because it is what the importer will enter in SABER.
The documents the manufacturer has to provide
The regulation requires a certificate of conformity issued by a body accepted by SASO, under the scheme known as Type 1a of ISO/IEC 17067, which is based on the examination of a sample and of the documentation of the model. The machine must be accompanied by a technical file containing at least the supplier's declaration of conformity, on the form annexed to the regulation, and the risk assessment document.
In practice the body also asks for general arrangement drawings, diagrams, the list of standards applied, test reports, the manual and photographs of the nameplate. A risk assessment to ISO 12100, written machine by machine and not copied from a generic template, is the document that moves the file forward without requests for additions.
If the machine is modified after the certificate, except for purely cosmetic changes, the certificate lapses and the request must be submitted again: format or power variants should be declared from the start as a family of models.
Manual, warnings and nameplate
The instructions must be written in Arabic, or in another language formally agreed with the user or the final importer. For an industrial line run by technicians English is often used, but the agreement has to be put in writing in the contract: without it, the language is Arabic.
Information and warnings on the machine should preferably be given with symbols and pictograms; written ones must be in Arabic or in a language the operators understand. Using the ISO 7010 signs reduces the text to translate and the mistakes.
The nameplate must be legible and indelible and show at least the manufacturer's name and address, the designation of the machine, the model or type, the serial number and the date of manufacture. Stating a date different from the real one is explicitly forbidden.
Lines shipped in several parts
A complete line rarely travels assembled. The regulation provides for this: when the machine cannot be imported assembled because of transport limits, it can travel in separate parts and the certificate is issued for the final model, provided it is shown that the parts belong to the certified model.
A packing list is therefore needed that links every package to the unit of the machine, with the same codes as the general arrangement drawings. It is work for the design office, before packing.
The design data to ask the customer for
The Saudi grid runs at 60 Hz, not 50: motors, gearboxes, pumps and fans turn faster and have to be selected or recalculated for that frequency. The plant voltage should be requested in writing, because it is not the same in every installation.
Then the climate: ambient temperature in the production area and outdoors, dust and sand, humidity and salt air in plants near the Red Sea such as those in Jeddah. They affect electrical cabinets, cooling, seals, lubricants and surface protection.
Finally the materials in contact with food and the detergents used for washing, the formats, the throughput at peak hours and the real space available in the production area, with access routes and floor load capacity.
Where to start
The safest path has four steps: get the customs heading and the name of the certification body from the importer; compare the existing technical file with the SASO regulation; adapt the risk assessment, manual, nameplate and warnings; prepare the packing list.
This guide summarises the regulations as read on the date of publication. The Arabic text published by SASO prevails and the last word on the documents belongs to the certification body: before signing a contract with penalties on delivery, it is wise to ask the body for the list of documents in writing.
Frequently asked questions
Who registers the machine on SABER, the manufacturer or the customer?
The Saudi importer. The manufacturer prepares the technical documents and supplies them to the certification body.
What is the difference between the product certificate and the shipment certificate?
The first covers the machine model; the second covers the single shipment, is valid for that shipment only and requires the product to hold the product certificate already.
Does the manual have to be translated into Arabic?
Yes, unless there is a formal agreement with the user or the final importer for another language, usually English. The agreement has to be written in the contract.
Can the technical file made for CE marking be reused?
Largely yes: risk assessment, drawings, diagrams and test reports are the same. What has to be added is the supplier's declaration on the SASO form, the references to the Saudi standards and the adaptation of manual, nameplate and warnings.
Does it also apply to partly completed machinery?
Yes, the general regulation on machinery safety includes it in its scope.
Do you handle the SABER procedure?
No. The procedure is opened by the importer and the certificate is issued by the body. We prepare the technical part: risk assessment, manual, nameplate, warnings, adaptation of the design to 60 Hz and to the climate.